Status: [LOCKED — short by design]

Principle: Partnership · Respect · Safety. In that order, every time.


10.1 What NBCU is to Assembly Atlanta

NBCUniversal is the anchor production tenant of the studio campus and the reason Assembly Atlanta has the early operational rigor it does. The relationship is the platform's most important external partnership.

This section is intentionally short. The detail belongs in operating cadence documents, not in a CEO-readable master.


10.2 Operating posture

Principle What it means in practice
Partnership We bring solutions, not problems. Issues are escalated with proposed paths, not handed up the chain raw.
Respect NBCU's production calendar, security posture, and confidentiality obligations are treated as our own. We never speak for NBCU externally.
Safety Safety, safety, safety. Always number one. Production environments have non-negotiable safety standards and we meet or exceed them on every campus-side service.

10.3 What's working

  • Production has run on the campus.
  • Operational coordination exists at a working level.
  • The relationship has weathered the broader industry cycles since 2023.

10.4 What needs formalizing

  • A single campus-side point of contact (Studio Ops Liaison seat — see §8) so NBCU does not have to navigate multiple campus seats for the same issue.
  • Documented service levels for the services the campus provides (utilities, security, access, facilities response).
  • A quarterly partnership review at the operating level — separate from any commercial conversation.

These are not new asks. They are bringing existing practice into documented form so the relationship survives any personnel transition on either side.


10.5 What stays out of this document

  • Commercial terms.
  • Production-specific operational detail.
  • Anything covered by NDA or by the lease.

If the CEO needs that detail, it is a separate, privileged conversation — not a master doc topic.


10.6 The one ask

CONFIRM CEO endorsement to formalize the Studio Ops Liaison seat (§8 Phase B) and the quarterly partnership review cadence as the operating posture going forward.

Everything else holds as-is.


Safety, safety, safety.